Sunday, July 27, 2008

Again in Bihar: 930 crore and 625 crore rail cum road bridges

SOME MAJOR BRIDGES UNDER EXECUTION IN EAST CENTRAL RAILWAYS

Ganga Railway Bridge at Digha in Patna is expected to be ready by 2007 at an estimated cost of Rs. 625 crore. The total length of this bridge including approach would be 20 km and the length of the main bridge between Digha and Pahleja Ghat would be 4.925 Km. As there is no rail link between North and South Bihar this project was taken up to face that traffic. Rail link is available only at Mokama at a distance of 93 km downstream of Patna. This new bridge between Digha and Pahleza is an useful infrastructure to improve trade and industries in that backward area.

RAIL CUM ROAD BRIDGE AT MUNGER

Ganges is a holy river where millions of Hindus throng to take bath and shed their sins as per Hindu belief. So it is an important pilgrim centre for one and all. A rail cum road bridge on Ganges near Munger has been taken up at a cost of Rs.930 crore. This 3.19 Km long bridge is 55 Kms down stream of the existing rail cum road bridge at Mokama and 68 Kms Upstream of the road bridge at Bhagalpur on river Ganges.

This magnificent bridge will connect NH31 of North Bihar to NH-80 of south Bihar and will also connect Jamalpur station of Sahibang Loop line (Malda division) of Eastern Railway to Barauni Katihar section on Sonepur division of East Central Railway. This mega bridge will support several lakh passengers from 2009 onwards.

No comments: